BDcharge Project of Chengdu Chuanhua Logistics Park Logistics Vehicle

2020-07-15 00:00:00
BDcharge Project of Chengdu Chuanhua Logistics Park Logistics Vehicle
Details:

Since 2018, Chengdu has begun to promote the construction of a green  low-carbon innovation system, fostering new energy, new materials, intelligent manufacturing, new energy vehicles, energy conservation  environmental protection  other industries. Vigorously implement new energy substitution, improve clean energy infrastructure construction,  incorporate the construction of electric vehicle bus charging piles into urban community reconstruction  new building planning.



According to the State Grid Chengdu Power Supply Company, Chengdu has more than 2,000 electric buses,  it is expected that the number will increase to more than 6,000 by the end of this year. By the end of 2020, more than 8,500 buses in Chengdu will be replaced by pure electric energy. Realize the "electrification" of public transport vehicles in Chengdu.



At the same time, by the end of 2020, Chengdu plans to form an extensive network of new energy electric buses, logistics distribution, car rentals,  time-sharing leasing services. The number of charging (replacement) power stations will reach 755,  the number of charging piles is expected to reach 110,000; meeting at least about The charging demand of 120,000 electric vehicles of various types.



Faced with the large number of new energy vehicles being launched, Sichuan Jiaotou New Energy Co., Ltd.  Sichuan Maiwo New Energy Co., Ltd. quickly kicked off the construction of the charging network in Chengdu Chuanhua Logistics Park, No. 88 Logistics Avenue, Xindu District,  conducted a nationwide screening of quality After several rounds of maturity comparisons on charging piles’ quality, qualifications, project operation experience, etc., the cooperative manufacturers of charging piles  platforms finally choose the pole charger. The pole charger will cooperate with Sichuan Jiaotou New Energy Co., Ltd.  Maiwo New Energy. The three parties jointly invested  reached an agreement on joint construction  joint operation of stations.



Sichuan Jiaotou New Energy Co., Ltd.  Sichuan Maiwo New Energy Co., Ltd. are the main body of project site management,  the actual operation main body undertakes  presides over the actual operation of the charging station; Jidu Charging provides charging pile equipment  technical support for early platform operation, which will be realized in the future Interconnection between platforms; 10 120KW DC dual gun charging piles  management  maintenance of the charging operation platform  equipment maintenance are provided for the project.



Jishu Charging has always attached great importance to the development of the Chengdu market. The professional team has been paying attention to the project  the beginning of the project to the operation. In order to ensure the normal operation of the 10 120KW charging piles of the Chengdu Chuanhua Logistics Park project, the contract was signed It only took less than 5 days to deliver the equipment  put it into operation. In the high temperature  heat, the Jishu charging team still insisted on its job responsibilities  won high praise  partners. This is Jishu people, your trusted partner!